Stanford Linear Accelerator Center

Prime has completed multiple projects for the Stanford Linear Accelerator Center (SLAC).

SLAC LCLS-II B950 NEH RECONFIGURATION
The work consists of construction and reconfiguration of Hutches 1.1 and 1.2 in the Sub-Basement. The LCLS-II NEH Recon-figuration Project in the basement level includes, but is not limited to construction of a Laser Hall, Laser Lab, Hutches 2.1 and 2.2, Timing Lab and RIXS Control Room, demolition and removal of existing utilities and installation of new HVAC and, electri-cal conduits, cable trays, and cabling, mechanical piping.

SLAC T3A & T3B
Removal, turn-over, and replacement of (2) 2,500 kVA medium voltage transformers in a substation. Performed LOTO, Medium Voltage terminations, 480V terminations, cable testing, grounding, rigging, and metal siding removal/replacement.

SLAC B041 – DOE SUPPORT BUILDING+ B052 CONTROL ROOM 
The 47,000 square foot build-out comprised of state of the art equipment to support the accelerator and its support staff. Addi-tional work involved linking the new ACR to the Main Control Center at Building 005 via a new duct bank.

Menlo Park, CA

Location: 

Owner: 

Various

GC: 

TECHNOLOGIES

Category: