KOMO was a negotiated Design-build project with Sellen Construction. KOMO Television currently occupies most of the Fisher Plaza East Building within the Fisher Plaza complex. The buildout required a complete emergency backup system to assure KOMO remained on the air regardless of the situation. This included the installation of two 1500 KW generators. Being primarily a broadcasting facility, there were numerous considerations as to power quality, circuit routing and sizing as well as upgraded security and life safety systems throughout. We are proud to state that PRIME met and exceeded all challenges and complexities of this premier project.