PRIME completed AT&T’s Generator Yard, providing partial power to many of the buildings on AT&T’s main campus. The extensive project involved a new generator and a new Diesel Rotary UPS (Drups) yard. PRIME’s team installed over three miles of conduit, worked on the underground rough-in for six new DRUPS units, and pulled conductors to two DRUPS. The project team also installed a new load bank, installed MV cables from switches to gear and set new medium voltage gear line-up.
Software Company Central Utility Plant
Redmond, WA
Location:
Owner:
Sellen Construction
GC:
INDUSTRIAL